Status Update of Asset Upgrading, Maintenance and Replacement Works at Sungai Langat Water Treatment Plant

3:30 pm

Kuala Lumpur – Pengurusan Air Selangor Sdn Bhd (Air Selangor) would like to inform that the asset upgrading, maintenance and replacement works at Sg Langat Water Treatment Plan (Sg Langat WTP) are being actively implemented. As of 3:00 pm today, the works have reached 72% and are still underway according to schedule.

The asset upgrading, maintenance and replacement works are expected to be completed at 7:00 pm, 10 October 2023 (Tuesday). Water supply will start to be distributed in stages to consumers once the water supply distribution system has been stabilised and is expected to fully recover at 12:00 pm, 12 October 2023 (Thursday).

Air Selangor will continue to mobilise water tankers to the affected areas, with priority given to critical premises such as hospitals, clinics and dialysis centres and funerals.

Consumers can obtain information on this scheduled water supply disruption from time to time through our official communication channels https://waterupdates.airselangor.com/. Consumers can also obtain information from alternative official communication channels such as the Air Selangor application, Facebook, Instagram and X or call Air Selangor’s Call Centre at 15300 or visit https://www.airselangor.com/.

-END-

Related posts

default
Air Selangor Shares 2023 Achievements, To Intensify Sustainability-...
Media

Published on 22 February 2024   Kuala Lumpur – In realising its 2030 vision to become the leading water services …

default
Air Selangor Shares Joy with Senior Citizens and Underprivileged Ch...
Media

Published on 9 February 2024   Kuala Lumpur – In conjunction with the Chinese New Year celebration this Saturday, Pengurusan …

default
Air Selangor Celebrates Three Charity Homes in Conjunction with Chr...
Press

21 December 2023 Kuala Lumpur – In sharing the joy of Christmas, Pengurusan Air Selangor Sdn Bhd (Air Selangor) under …